Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
Record references
- Release reference
211d12a4-1d38-41e9-a813-f68fe15d3679-714815- Published tags
- award
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Contracts Finder notice for the full record.
ocds-b5fd17-01aa2dc0-4703-4603-b170-c863e3558e61Published facts
211d12a4-1d38-41e9-a813-f68fe15d3679-715389EKFB is seeking to appoint a competent sub-contractor to design, supply and install the temporary M+E package for the Green Tunnels, which includes, but is not limited to: - power supply - general and emergency lighting - firefighting system (water supply and fire main) - signage - brackets These will contribute in providing a healthy and safe environment whilst constructing 3no twin-bore cut-and-cover tunnels. The temporary M+E should be in service from the commencement of the MWCC activities inside the tunnels and will remain until the permanent M+E is installed (by others). The installation should be done in multiple visits, following the construction sequence of the tunnels. These visits should be short and efficient to ensure the disruption of other activities is minimum. Anticipated Programme Greatworth - from Jan 22 (in stages) Chipping Warden - from Sep 21 (in stages) Wendover - from Jul 22 (in stages)
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
211d12a4-1d38-41e9-a813-f68fe15d3679-714815Award record updated
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
211d12a4-1d38-41e9-a813-f68fe15d3679-715389Awards and suppliers
Buyer: BIP SOLUTIONS LIMITEDSupplier: Unknown supplier
ocds-b5fd17-01aa2dc0-4703-4603-b170-c863e3558e61-1End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.