Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
Record references
- Release reference
5e1601b8-73b5-4f88-b948-f9c7fe6991cd-887606- Published tags
- award
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Contracts Finder notice for the full record.
ocds-b5fd17-027f0819-1fd5-4b9f-b3dc-0b4509395affPublished facts
5e1601b8-73b5-4f88-b948-f9c7fe6991cd-887606The Ofgem Clean Power 2030 Action Plan (CPAP) requires around 10-12GW of consumer led flexibility by 2030, with this value increasing by 2035 with more electric vehicle (EV) uptake and bi-directional charging. Of this target around 3 GW is due to district heating and I&C flexibility, leaving a total of around 7 - 9 GW coming from residential sources, predominantly EV charging. The ability of residential customers to provide flexibility is rapidly evolving with an increase in large capacity assets (EVs, heat pumps, batteries), hardware to enable access to flexibility (smart connections), and the development of propositions enabling customers to engage with flexibility services and obtain value. However, the extent to which this can contribute to the 7 - 9 GW of residential flexibility required by 2030 is uncertain. Ofgem therefore requires analysis to be conducted by a supplier to assess the contribution that residential flexibility can make to CP2030 and specifically the effect of residential flex on the cost allocation and recovery review (CARR) programme
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
5e1601b8-73b5-4f88-b948-f9c7fe6991cd-887606Awards and suppliers
Buyer: OfgemSupplier: Delta Energy & Environment
ocds-b5fd17-027f0819-1fd5-4b9f-b3dc-0b4509395aff-1End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.