Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
Record references
- Release reference
0a56390f-b922-4d7b-a865-a81c3ca036c4-742371- Published tags
- award
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Contracts Finder notice for the full record.
ocds-b5fd17-10cef106-0da2-4079-99ab-b97d3891a5b2Published facts
0a56390f-b922-4d7b-a865-a81c3ca036c4-742371This appointment is to provide fire assessments and consultation services to Bromford. To include but not limited to: • To read and comprehend any fire strategy documents and plan drawings that have been produce for, and on behalf, of the developer. • Prior to submission to the relevant building control authority make comments on the fire strategy in line with best practice and report these comments to the client. • To ensure the fire strategy document is compliant with the building design guidance being adopted for construction e.g. Approved Document B, BS 9991, or BS 9999. • To ensure that during the phases of building that you are influencing the Contractor/Developer to ensure all appropriate industry standard applications, processes and best practice are adhered to, especially- o fire ratings for compartmentation. o fire ratings for compartmentation penetrations. o fire ratings for installation of fire doors, shutters, dampers and smoke control installations. o Fire rating and installation of any cavity barriers. • To be able to determine with BHA/BDL and the Contractor/Developer the suitability of any proposed- o fire detection & alarm system, o smoke control system, o emergency lighting system, o automatic water suppression system, o lightning protection system, o external wall façade system, o dry rising fire main installation. • To ensure that suitable access arrangements by way of inspection hatches are provided to allow for ongoing testing, servicing and maintenance of any building system. • To ensure that suitable photographic records are made of the phases of development including all fire stopping measures which become unseen on completion of works and provided to the client prior to the Practical Completion as defined under the building Contract. • To check on the competency of installers carrying out specialised works. • To refer to a suitable expert in the event of any aspect of work falling outside of the consultant's area of competence. • To liaise with Construction Managers, Project Managers and the Employers Agents to ensure that any identified shortcomings in works are made good to industry best practice. Any defective work should in respect of Fire Safety and adherence to plans ought to be reported to the Employers Agent with photographic evidence and suggestions for remediation copying in the CQM, and Project Manager as well as the wider Project Team of the Developer/Contractor. • To liaise with Bromford's Fire Safety Team of Fire Risk & Compliance Assessors at suitable times to enable a fire risk assessment to be carried out at, or near to, occupation of the building. • To inform Bromford of any changes of legislation that may impact the fire risk assessment outcome before completion of the building.
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
0a56390f-b922-4d7b-a865-a81c3ca036c4-742371Awards and suppliers
Buyer: BROMFORD HOUSING GROUP LIMITEDSupplier: Firntec Ltd
ocds-b5fd17-10cef106-0da2-4079-99ab-b97d3891a5b2-1End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.