Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
Record references
- Release reference
b801a9f7-4d34-4644-aa66-cab0c37aea28-764502- Published tags
- award
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Contracts Finder notice for the full record.
ocds-b5fd17-13528c57-2587-46ac-a562-03ee5f141da1Published facts
b801a9f7-4d34-4644-aa66-cab0c37aea28-764502Scope of Works: The station is the London interchange station of the UK's second high-speed railway. It will be located on the site of the now demolished Old Oak Common Railway Depot, bounded by the Crossrail Depot to the north, the London Overground West London line to the east, the Intercity Express Programme Depot to the south and Old Oak Common Lane to the west. HS2, Great Western Main Line (GWML), Crossrail and Heathrow Express services will be served by the new Old Oak Common Station. HS2 Old Oak Common Station will provide a state-of-the-art gateway to London and the wider area, with efficient intermodal interchange with rail, taxi, cycle and pedestrian modes. Urban Realm packages involve all the outside space aside any building structures, spanning over an area of approximately 50000m2. BBVS is seeking to contract under NEC3 Option A with a contractor to deliver the first sub package of works that includes the following elements in summary: Normal and lightweight fill earthworks (more than 75k m3), and associated reinforced concrete retaining structures Excavation works and reinforced concrete structure for DNO housing building Boundary fences and associated foundation pads & retaining walls, inclusive of earth bonds. Underground reinforced concrete attenuation tanks Overground reinforced concrete attenuation tanks Reinforced concrete foundation slabs for cycle hub, catering building and water gardens Deep & surface water drainage, fire hydrant network, water networks, LV/HV/ other ducting & other associated infrastructure such as utilities access chambers The scope of the subcontract includes but not limited to: The provision of all necessary People, Equipment, Plant & Materials (temporary or permanent) to deliver RIBA 5 Design, mock-ups, temporary works, fabrication, installation, & certification of the associated works The Subcontractor will need to demonstrate that they have the capabilities & resources to deliver the size and nature of this project in a rail environment. The Subcontractor will be required to produce & submit 2D/3D designs in native DGN files, working on projectwise and other software platforms. The Subcontractor will be required to liaise with organisations such as Transport for London, Crossrail Depot, Network Rail & Thames Water. Webinar For further information and visuals, please watch our BBVS Webinar recording on the whole Urban Realm activities: https://attendee.gotowebinar.com/recording/4015116724636723457 Please note, all information included within the presentation is indicative and is for information purposes only. Also, please note the procurement slides are subject to revision. Programme It is currently anticipated that the site works will be predominantly completed between Q3 2024 and Q4 2027, with a preconstruction period prior to site activities. Additional information: No Documentation is included at this point.
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
b801a9f7-4d34-4644-aa66-cab0c37aea28-764502Awards and suppliers
Buyer: BIP SOLUTIONS LIMITEDSupplier: Kilnbridge Construction Services Ltd
ocds-b5fd17-13528c57-2587-46ac-a562-03ee5f141da1-1End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.