Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
Record references
- Release reference
dac98280-6885-48ac-97ec-456174f7a918-781758- Published tags
- award
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Contracts Finder notice for the full record.
ocds-b5fd17-20d4b095-8185-4327-83c8-4f9ea796fec8Published facts
dac98280-6885-48ac-97ec-456174f7a918-781758Madeira Terrace is a well-known and much-loved Brighton and Hove Landmark. At 865m long in total it is one of the longest cast-iron structures in the world and an admired piece of Victorian architecture, integral to the Eastern Seafront. It is also a significant Grade 2* listed structure within the rich heritage context of the wider coastal city. Phase 1 of the Madeira Terrace Restoration project encompasses 40nr arches sitting between the Royal Crescent steps and the Shelter Hall / Concord 2. The cast iron structure forms a backbone describing the historic development of the seafront. Addressing the sea and the beach firmly braced against the rising East Cliff wall rising behind. It is a 'backdrop': designed and intended to be used and inhabited by the residents of the city for all manner of events and social occasions; for quiet enjoyment, outdoor exercise and for viewing. The structure is now deemed unsafe and public access has not been possible for a number of years, due its condition. The Phase 1 project includes the following elements of works: • Conservation and repair of the historic cast iron structure. • Conservation and management of the historic Japanese Spindle green wall [dating from 1872], and other planting associated with the Green Wall. • Repairs to the facing of the east cliff-wall (a designated highways structure) to ensure public safety; and re-presentation of its surface to visually unify and present a more attractive backdrop to the restored structure. • Public realm landscaping to both the terrace deck above and the promenade walkway below, including new hard surfacing, soft landscaping and street furniture. • Local improvement to Madeira Drive, via new pedestrian crossing points. • New lighting and servicing infrastructure • Repairs and upgrades to the existing lift mechanism within the Shelter Hall / Concorde 2 building, to allow its continued historic function as the original means of step-free access to the terrace. • A new external public lift
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
dac98280-6885-48ac-97ec-456174f7a918-781758Awards and suppliers
Buyer: Brighton & Hove City CouncilSupplier: J.T.MACKLEY & CO.LIMITED
ocds-b5fd17-20d4b095-8185-4327-83c8-4f9ea796fec8-1End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.