Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
Record references
- Release reference
45e48e9c-2a06-46d8-9dd6-f4cfdb96a956-684314- Published tags
- award
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Contracts Finder notice for the full record.
ocds-b5fd17-2eb9694c-b9fc-4f96-a15e-bcaf6164d6efPublished facts
45e48e9c-2a06-46d8-9dd6-f4cfdb96a956-684314In December 2020 the University declared a Climate and Ecological Emergency and in May 2021 the University set a target to reach net zero scope 1 and 2 carbon emissions by 2035 from a 2019 baseline of 12,300 tonnes, with a maximum of 3,000 tonnes of offsetting. The University has reduced its scope 1 and 2 carbon emissions from a peak of 18,851 in 2012 to a low of 8,997 tonnes in 2020 due to the COVID-19 pandemic. Emissions have risen back to 10,475 tonnes in 2021. The Wivenhoe Campus was completed in the mid-1960s by Kenneth Capon of the Architects Co-Partnership (ACP). It is a purpose designed university campus designed around five interlinked squares set in a 200-acre parkland to the southeast of Colchester. A key feature of the original architectural narrative of the Colchester campus is the metal framed single pane glass windows and the brutalist architecture. It consists of a reinforced concrete frame which has both precast and in-situ elements. The facades have exposed precast concrete columns and non-structural precast mullions. A significant part of achieving net zero scope 1 and 2 carbon emissions involves building fabric improvements and a priority will be the original 1960's single pane glass windows across much of the Colchester campus.
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
45e48e9c-2a06-46d8-9dd6-f4cfdb96a956-684314Awards and suppliers
Buyer: UNIVERSITY OF ESSEXSupplier: Purcell Architecture Ltd
ocds-b5fd17-2eb9694c-b9fc-4f96-a15e-bcaf6164d6ef-1End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.