Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
Record references
- Release reference
caa314b4-af26-4c65-9cca-92ed59a10ca9-84589- Published tags
- award
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Contracts Finder notice for the full record.
ocds-b5fd17-31e35260-adc9-11e6-9901-0019b9f3037bPublished facts
caa314b4-af26-4c65-9cca-92ed59a10ca9-84589The Plot 3 Infrastructure works around Temple Quay being approximately 3,000m2 of pavement construction, generally comprise of stone capping with tarmac sub-base, sand and block paving, and associated works will include the following components: • Earthworks • Extension of Friary to Meads Reach Bridge o This work would comprise the extension of Friary as a two carriageway road east of Isambard Walk to Meads Reach Bridge. o As part of this work the footway to the north of Friary (adjacent to the Plot 3 development site) would be extended to 6 metres in width, as will the footway to the south (adjacent to the station) would be made 8.5 metres in width and include the provision of 6 new benches and an avenue of 5 new trees. o The Friary will terminate with the provision of a new flexible use open space • Flexible Open Space o Space for temporary use will also be provided between the extended Friary and the listed retaining wall (outside of development area) o The area will be finished with seating terraces, and a planted bank to tie into the existing levels forming an earth retaining structure. o This area will also need to be made capable of accommodating the occasional vehicle turning. • Opening Isambard Walk as a two-way vehicular street between Friary and Temple Back East o The existing pedestrianised Isambard Walk will be opened for two-way vehicle access to create a link between Temple Back East and Friary, and to tie in with the existing road of the private estate. As part of this work a new footway will also be provided to the eastern side of the Isambard Walk new carriageway. o Isambard Walk will act as a shared space, and so will be treated to reduce the potential dominance of vehicles and reduce vehicle speeds o The footway, trees, cycle parking and street furniture to the west of Isambard Walk and in The Square would remain as existing. • Temple Back East o The existing turning head area on Temple Back East would be removed, to allow two way vehicular access to Isambard Walk o Two way vehicular access will be maintained to Rope Walk, with a left turn out of Rope Walk into Isambard Walk to be provided for o Existing crossing will be maintained across from The Square to the footway on Temple Back East
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
caa314b4-af26-4c65-9cca-92ed59a10ca9-84589Awards and suppliers
Buyer: HOMES & COMMUNITIES AGENCYSupplier: Dyer and Butler
ocds-b5fd17-31e35260-adc9-11e6-9901-0019b9f3037b-1End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.