81108573-5019-4d66-b5f8-efea27d282fe-729077- Published tags
- planning
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Contracts Finder notice for the full record.
ocds-b5fd17-42ae9037-0c21-457b-8baf-f212e117f189Published facts
71daf045-4726-42a4-8fd3-0b11328a4071-886945National Highways have awarded a national framework, the Legacy Concrete Roads Reconstruction (LCRR) framework, that allows the delivery of concrete roads reconstruction schemes. The framework scope for the LCRR framework includes: - design and subsequent construction services for: - demolition of existing concrete pavements, - reconstruction of pavements (including new pavement furniture and markings) - design and delivery of associated temporary traffic management solutions, - when instructed: - involvement in optioneering, - design and construction of alterations to those legacy assets which interface with the replacement pavements' designs, which may include sub-surface drainage, street furniture and its foundations and signage, - design and construction to replace legacy central reserve with a hardened solution and overlay legacy concrete pavement with a long-life pavement solution (including new pavement furniture and markings), - performing principal designer and principal contractor duties as defined under the "Construction (Design and Management) Regulations 2015" ("CDM Regulations 2015"), - carbon capture recording and reporting, - recovery, recycling and reuse of arisings during the delivery of a scheme, - engagement with all identified stakeholders, and - identification, recording and realisation of programme efficiencies. The LCRR framework is six years in duration to ensure alignment to and coverage of the RIS3 funding period (2026-31) but also to overlap with the beginning of RIS4 (2031-36) in case of any delays in approvals of the strategy or funding for RIS4. This alignment of duration with our funding periods is required from a procurement, commercial and operational perspective because it provides greater efficiency and certainty that the strategic plan for which funding is received can be delivered consistently; clarity for future procurements and sufficient time to embed learning, best practice and investment in innovations. From a National Highways perspective, the proposed framework term allows for the RIS4 settlement to be finalised and agreed prior to the LCRR frameworks successor being procured. This will bring certainty of work and value to the future procurement.
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Planning notice observed
Latest variant observed by Bidwake on .
No verified official notice link is available for this event.
81108573-5019-4d66-b5f8-efea27d282fe-729077Tender notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
43f05772-5ec3-467c-b9be-a8829eaf9134-819562Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
71daf045-4726-42a4-8fd3-0b11328a4071-886945Awards and suppliers
Buyer: National Highways LimitedSupplier: JOHN GRAHAM CONSTRUCTION LIMITED
ocds-b5fd17-42ae9037-0c21-457b-8baf-f212e117f189-1Buyer: National Highways LimitedSupplier: John Sisk and Son Limited
End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.
ocds-b5fd17-42ae9037-0c21-457b-8baf-f212e117f189-1Buyer: National Highways LimitedSupplier: Kier Transportation Limited