Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
Record references
- Release reference
18499f13-4c1d-46f7-bb9e-93b9a2a6cbd9-87586- Published tags
- award
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Contracts Finder notice for the full record.
ocds-b5fd17-501bb683-adc9-11e6-9901-0019b9f3037bPublished facts
18499f13-4c1d-46f7-bb9e-93b9a2a6cbd9-87586DECC is looking for a contractor or contractors to: •carry out a partial formula audit; and, •reconstruct a set of Microsoft Excel work books using DECC standard model quality assurance guidance and spreadsheet template https://www.gov.uk/government/collections/quality-assurance-tools-and-guidance-in-decc. The workbooks are known as “backing sheets”. They calculate a set of input parameters for eight sectors of a whole system energy model built in the TIMES software. N.B there is no requirement for the contractor to be familiar with this software. The final output of the project will be a set of reconfigured work books that: •are structured according to agreed best-practice, following key principles such as high levels of transparency and easy traceability; •contain as few workbooks and worksheets as possible but no fewer; •are well documented, with: oin-model documentation (N.B. high level documentation describing the structure of the model will be supplied) of each of the calculations and assumptions (with sources) in the input work books; oinput variables identified and referenced; and, •include the facility for ranges for the most “important” variables - for uncertainty analysis. The existing work book structure is complex for each sector there are many interlinked work books. There are approximately 285 work books. The complexity of each sector varies. The table below shows approximate numbers of equations in each of the sectorial models. Agriculture324 Electricity1899 Industry5513 Processes1634 Residential4115 Resources733 Services2814 Transport6406 For background information, the full specification and further information on this project please see the ITT. The successful bidder will need project management expertise to deliver the evaluation, in particular because a significant proportion of the core funding for this project is allocated to the financial year 2014-15. Break points will be built into the contract.
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
18499f13-4c1d-46f7-bb9e-93b9a2a6cbd9-87586Awards and suppliers
Buyer: DEPARTMENT OF ENERGY AND CLIMATE CHANGESupplier: Cambridge Energy
ocds-b5fd17-501bb683-adc9-11e6-9901-0019b9f3037b-1End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.