Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
Record references
- Release reference
ee8a1b9f-449c-44f7-b335-e6846d30ae73-757072- Published tags
- award
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Contracts Finder notice for the full record.
ocds-b5fd17-51d658f1-c077-4171-804a-5fe886048fd1Published facts
ee8a1b9f-449c-44f7-b335-e6846d30ae73-757072Works to design, configure, prefabricate, deliver, and install a Modular building Unit (partitioned into CPT & Storage) including internal fitting of specialist equipment to meet a registered Changing Places toilet as set out in BS 8300-2:2018 that meets the needs of every user. All works are delivered full turnkey. The requirement is divided into 2 Lots: Lot 1- Highlodge Lot 2 - Beechenhurst Lot 1 must be completed by end October 2024 and Lot 2 must be completed by end November 2024. Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
ee8a1b9f-449c-44f7-b335-e6846d30ae73-757072Awards and suppliers
Buyer: Forestry England (on behalf of Forestry Commission)Supplier: RISE ADAPTATIONS LIMITED
ocds-b5fd17-51d658f1-c077-4171-804a-5fe886048fd1-1End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.