Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
Record references
- Release reference
574724d3-f89e-4344-a4f2-cf8957ec9ced-863289- Published tags
- award
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Contracts Finder notice for the full record.
ocds-b5fd17-5c29a969-9119-4d05-99e4-7556fd0d4d78Published facts
574724d3-f89e-4344-a4f2-cf8957ec9ced-863289The works involve resurfacing at the rear exit following the removal of crocodile teeth, vegetation clearance, and the replacement or re-setting of damaged and loose kerbs across the site, including lighting column islands and the main carpark. A steel bollard will be removed and re-set with a new concrete foundation, while 73 damaged expansion kerbs in the rear section will be replaced with new kerb and tarmac finishes to specification. Additional works include resurfacing around an inspection cover, cleaning all gully pots, and renewing defective footpath surfacing. A 5% contingency has been allowed for unforeseen works instructed by the client during the project.
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
574724d3-f89e-4344-a4f2-cf8957ec9ced-863289Awards and suppliers
Buyer: Malvern Hills District CouncilSupplier: Cottrill Civil Engineering Contractors Limited
ocds-b5fd17-5c29a969-9119-4d05-99e4-7556fd0d4d78-1End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.