Tender notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
Record references
- Release reference
dbb71d67-366b-47d8-934d-334168c6124c-711551- Published tags
- tender
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Contracts Finder notice for the full record.
ocds-b5fd17-6e7d08b4-9fa7-4291-9054-07b24ca40dfcPublished facts
06616859-9ff1-4cc5-a3d5-881522d52c7b-755772B4069 Lyneham Banks Repairs \r \r In 2022 significant a significant landslip took place on the B4069 Lyneham in North Wiltshire. The resulting landslip dislodged around 90m of the existing carriageway downslope. The B4069 has been closed since February 2022 when the landslip took place, movements continued throughout the first part of 2022 until slowing significantly during the summer months. \r \r The B4069 is a regionally important route providing connectivity between junction 17 of the M4 and North Wiltshire as well as serving several local communities. The road when opened normally takes around 5500 vehicles a day. \r It is proposed to stabilise the slope with a contiguous piled embedded retaining wall with capping and upstand at the top. The proposed structure will be constructed on the northern side of the B4069 with a length of approximately 109m. \r \r A in-situ reinforced concrete (RC) capping beam will be supported on a single row of 600 mm diameter bored concrete piles. The in-situ capping beam will be 1000 mm wide and 1500 mm deep structurally connected with the piles. The capping beam will be connected to tension micropiles to provide additional lateral ground support to the retaining wall.\r \r A vertical infill parapet or edge restraint is also considered to be provided at this location. The new parapet may be installed in the verge or attached directly to the capping beam at the back of the verge. Highway works will include reinstatement of the carriageway, pavement, drainage, and kerbs. To provide improvement to the existing highway drainage system, it is proposed that the highway shall be drained by a combination of gullies, carrier/ collector pipes and catchpits. The proposed highway drainage will outfall to a watercourse north of the B4069 via a new culvert. \r \r To ensure effective drainage of the site a number of land drainage measures will also be put in place on 3rd party land either side of the B4069. \r \r The works will be designed and built in accordance with current standards and guidelines, and will include for all key aspects of highway construction - piling, earthworks, carriageway, drainage, signage, and hard and soft landscaping works.
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Tender notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
dbb71d67-366b-47d8-934d-334168c6124c-711551Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
06616859-9ff1-4cc5-a3d5-881522d52c7b-755772Awards and suppliers
Buyer: Wiltshire CouncilSupplier: Octavius Infrastructure Ltd
ocds-b5fd17-6e7d08b4-9fa7-4291-9054-07b24ca40dfc-1End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.