Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
Record references
- Release reference
464019c8-ccbb-486a-b25d-761110d21ed3-808737- Published tags
- award
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Contracts Finder notice for the full record.
ocds-b5fd17-879a545b-4276-4d50-b41f-867fcc59a0b0Published facts
464019c8-ccbb-486a-b25d-761110d21ed3-808737The "Folkestone - A Brighter Future" scheme seeks to 'level up' Folkestone's town centre by supporting active travel, creating a high-quality environment that supports civic pride and reverses years of disparity in investment by transforming the fortunes of the towns primary retail areas. The requirement of this contract of works is to design and manufacture the superstructure of a pedestrian footbridge to connect Guildhall Street North to Shellons Street. A footbridge is proposed to link Guildhall Street North and Shellons Street more-directly near the location of its pedestrian crossing, to re-establish the link which was severed by the construction of the A2033 link (Foresters Way and Shellons Street). Previously an earthwork ramp solution was considered for providing this link but due to challenges associated with this proposal, such as the impact on existing services and the level of visual intrusion it would cause, the footbridge structure was proposed by AECOM as it is considered to be a better solution. The superstructure contractor will need to work closely with Aecom (design consultant), who are responsible for designing the substructure for the bridge to ensure that the design of the superstructure and substructure are coordinated. Two Agreement in Principle (AIP) submissions will need to be made for the KCC Structures Technical Approval Process (TAP), Aecom (as the substructure Designer) will prepare the submission for the substructure, but the superstructure contractor will need to prepare the submission for the superstructure. It will be essential for Aecom and the superstructure contractor to work closely to ensure that the submissions are made at the same time and are co-ordinated.
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
464019c8-ccbb-486a-b25d-761110d21ed3-808737Awards and suppliers
Buyer: Kent County CouncilSupplier: Cake Industries
ocds-b5fd17-879a545b-4276-4d50-b41f-867fcc59a0b0-1End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.