Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
Record references
- Release reference
e6dfda97-9994-41ba-a5e4-9a6fb1c4629f-94714- Published tags
- award
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Contracts Finder notice for the full record.
ocds-b5fd17-96631d6f-adc9-11e6-9901-0019b9f3037bPublished facts
e6dfda97-9994-41ba-a5e4-9a6fb1c4629f-94714To undertake all design and build tasks associated with upgrade and refurbishment of the Mare Harbour Ro-Ro Facility for continued use by the Falklands Island Re-Supply (FIRS) Point Class vessel detailed below: • To provide Mare Harbour Falkland Islands with a RO-RO facility suitable to cater for berthing, mooring and offloading of the FIRS Point Class vessels. • To provide Mare Harbour Falkland Islands with a facility that is capable of supporting Small Boat Operations. In order to meet these Requirements, the Works to be executed under this Contract shall include, but not be limited to, the design, construction, installation, testing, commissioning and remedying of defects of the following items: Works including, amongst other requirements: • Provision of a quay structure to act as a berthing face for the safe berthing of the FIRS Point Class RO-RO vessels • Provision of supporting quay structures for mooring points to enable safe mooring • Provision of pedestrian access gangways between the existing T-head jetty, the mooring points and the berthing face • Provision of Fendering and mooring equipment, and safety equipment • Minor repair to the quay face at the stern ramp for the RO-RO • Cathodic protection to all existing sheet piled structures (including the T-head jetty), where these are retained for use in the facility • Provision of a new small boats jetty comprising a pontoon on piled moorings and a linkspan, to support small boat operations • Associated M&E services • Demolition and disposal of existing structures where these are not re-used The design must consider the significant logistical and environmental constraints which are present at operational ports. The requirement is for a 25 year design life for all elements of this project. All designs are to comply with relevant EU, UK and FI legislation.
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
e6dfda97-9994-41ba-a5e4-9a6fb1c4629f-94714Awards and suppliers
Buyer: MINISTRY OF DEFENCESupplier: Volkerstevin Ltd
ocds-b5fd17-96631d6f-adc9-11e6-9901-0019b9f3037b-1End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.