Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
Record references
- Release reference
02a430b1-78c5-49f6-8c26-87a95068853f-717685- Published tags
- award
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Contracts Finder notice for the full record.
ocds-b5fd17-a0386618-ce39-46e8-9748-7c970d043331Published facts
02a430b1-78c5-49f6-8c26-87a95068853f-717685OFR have been appointment to provide MEP Services for Stage 2-5 on the works taking place at the Corner Plot, Rochdale Station Square. The roles and requirements will include, Scope of Works -Establish the design brief with the Client and confirm the relevant fire safety design objectives for the project. -Confirm any additional design requirements such as insurance. -Highlight any significant constraints arising from the site such as fire service access, boundary conditions, water supplies and crowd dispersal, etc. -Identify where a fire engineered (non-standard) approach could add value by reducing build costs, shortening the construction programme or enhancing the design (e.g. increasing net area, flexibility and functionality). -Expand on the level of detail provided to align with the developing design. Specifically, additional and more detailed advice will be required with regards to the fire safety requirements for MEP services and equipment, fire dampers, penetrations through fire resisting construction, risers, etc. The Fire Engineer to also identify key fire compartmentation interfaces internally and externally. -Develop the detailed fire strategy report, covering and progressing the same key issues, as outlined in the Concept Design stage scope above. -Detailed advice will be required with regards to the fire safety requirements for MEP services and equipment, fire dampers, penetrations through fire resisting construction, risers, etc. OFR to also identify key fire compartmentation interfaces internally and externally. -Attend workshops and technical design meetings and comment on design iterations to meet the demands of the programme. -Attend meetings with the approval's authorities, to discuss the outline proposals with a view of minimising the approvals risk. Also help to drive the Fire Service consultation process at this stage by working with the lead approver to ensure consultation takes place as early as possible. -Review the design documentation produced by others for compatibility with the fire strategy, commenting accordingly, and make all reasonable endeavours to ensure consultants are producing documentation which complies with the Fire Design Strategy Report. This may require the OFR to set up specific fire coordination meetings with the other key consultants (Architect, MEP, Structures, Accessibility, Façade, Vertical Transportation, CDM).
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
02a430b1-78c5-49f6-8c26-87a95068853f-717685Awards and suppliers
Buyer: Rochdale Metropolitan Borough CouncilSupplier: OFR Consultants Limited
ocds-b5fd17-a0386618-ce39-46e8-9748-7c970d043331-1End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.