2c9d7f68-afbb-4b44-99c3-19c784400620-185425As a part of the Castleford to Wakefield Greenway scheme a cycleway bridge is required to cross the existing railway. The crossing position is at the position of an existing bridge which has since been removed. Abutments remain but these are not to be utilised in the design, though the effect of their possible removal must be considered by the designer. The feasibility report has recommended a 35m span steel bridge on abutments independent and not reliant on the existing abutments. The contractor is to design and build a 35m span steel cycleway bridge in accordance with the current Design Manual for Roads and Bridges and the Manual of Contract Documents for Highway Works as published by DfT. The design must also include for all requirements of Network Rail in crossing their infrastructure. The works comprise: DESIGN STAGE Ground investigation - scope Topographical Survey Environmental Surveys, Statement and Mitigation. Input to Safety Audits all Stages C3 and C4 notices and estimates Liaison with Wakefield Council and outside bodies Liaison with Network Rail Network Rail Procedures Detailed design of the rail bridge including AIP and Category 3 Check. Signal Sighting Report Progress meeting attendance Programme preparation and monthly updates. Dealing with all technical queries during construction Network Rail Liaison Design/Query Procedures during Construction. Construction Phase 1 Construction of the designed bridge. 2 Construction of approximately 400m of 3m wide cycleway on the remains of a dismantled railway and across the new bridge. This cycleway will tie in to the existing cycleways constructed by others. Additional information: All documents available from Yortender Web Portal www.yortender.co.uk ref number DN280473
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
2c9d7f68-afbb-4b44-99c3-19c784400620-185425Awards and suppliers
Buyer: Wakefield Council Customer ServiceSupplier: Amalgamated Construction Limited
ocds-b5fd17-cbc06de8-436a-48ac-b852-24f5bdf48dce-1End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.