Tender notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
Record references
- Release reference
cc663abb-4ed7-4d9e-a5bf-75e134ad3074-828674- Published tags
- tender
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Contracts Finder notice for the full record.
ocds-b5fd17-d52aa3cb-f4fe-4e39-a6b6-a70dc545dc63Published facts
dc2bb8b2-6669-4783-a23f-89296356fea6-877852Central Region - East - Woodbridge, Suffolk - LPG Network Replacement for 200 properties Brief scope of works This project entails the D&B of a replacement LPG network supplying 200 properties on the Woodbridge estate. The cttr will be responsible for creating a network design that meets current stds, incorporating recommendations from a DNV Technical Report. To facilitate seamless construction and ongoing maintenance, the design must support a phased approach, allowing properties to transition from the existing LPG gas supplies to the new network in stages. Each property will have a ground-mounted meter installed, to allow for other utilities. The contractor will handle all excavation/installation/testing of the LPG mains/service connections. Each segment of the network will undergo pressure testing in line with IGEM stds. At completion, the cttr will restore affected sites, incl pathways and landscaping. Final inspection with stakeholders will verify compliance, and comprehensive O&M and as-built docs, including test certs, will be provided as part of the closeout process. For Amey to accept any EoI it is ESSENTIAL that any subcontractor is: • willing to act as Main Contractor (ESSENTIAL); • a member of Constructionline at GOLD; • capable of working in a BIM environment; • compliant with DefStan 05-138 • willing to deliver Social Value to our Client. DESIRABLE attributes of our Supply Chain: • have a CSR policy; • have a Bus Cont & Disaster Rec'y Plan If successful the subcttr will need to pass a PQQ, sign up to Amey T&Cs, and meet the MoD Sec Reqts. Expressions of Interest, BY EMAIL ONLY. Procurement Documentation will follow separately via a link from Curtis Fitch. Note 1: The bidder must quote for all aspects of the Works. Note 2: Future works of a similar nature may be negotiated based upon submitted rates. Note 3: Those making an EoI will be required to sign-up to our 'Sub-Contract Agreement' where 'Mini Competitions' or 'Call Offs' will be used to tender works/services. Note 4: For complex projects such as External Wall Insulation installation, Structural works etc. it is a requirement that the bidder must (at Contract Award) carry Professional Indemnity Insurance cover of not less than £1,000,000. Note 5: Those making an EoI will be assessed in accordance with the Public Contract Regulations 2015 i.e. Regulations 57, 58 and 60. Amey Defence Services expressly reserves the right to require those making an EoI to provide additional information supplementing or clarifying any of the information requested. Note 6: Depending on Amey's annual spend with individual bidders you may be required to either have committed to the Science Based Targets Initiative (SBTi), set SBTi approved near-term targets, or Net Zero targets. This opportunity is also advertised on Constructionline. ADS does not bind itself to accept any tender and is not liable for any costs incurred by those expressing an interest or tendering for this opportunity.
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Tender notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
cc663abb-4ed7-4d9e-a5bf-75e134ad3074-828674Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
dc2bb8b2-6669-4783-a23f-89296356fea6-877852Awards and suppliers
Buyer: AMEY DEFENCE SERVICES LIMITEDSupplier: RJC (MECHANICAL) LTD
ocds-b5fd17-d52aa3cb-f4fe-4e39-a6b6-a70dc545dc63-1End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.