Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
Record references
- Release reference
3ce6eae4-bde2-410a-af02-2ddc0363f93d-710798- Published tags
- award
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Contracts Finder notice for the full record.
ocds-b5fd17-dc7cecaa-fab8-4672-b58c-445510a64375Published facts
08849b87-bb0d-4d44-a617-136864b30994-889445This notice relates to a modification to https://www.contractsfinder.service.gov.uk/Notice/3ce6eae4-bde2-410a-af02-2ddc0363f93d The Contracting Authority intends to modify the above referenced Contract to increase the maximum Contract value to ensure continued delivery of essential planned works during the remaining Contract Term. The need for this modification has arisen due to unforeseen circumstances affecting programme delivery, specifically: • the non performance of another contractor; and • the insolvency and subsequent termination of a further contractor, both of which have resulted in a significantly higher volume of works being required from the remaining Contractors than originally anticipated at the point of award. To maintain service continuity across the housing portfolio, the Authority must redistribute these essential works to the remaining Contractors. This modification increases the maximum Contract value by up to £3,000,000, resulting in a revised potential maximum value of £9,000,000. The uplift enables the Authority to deliver works that cannot be deferred without creating risks to asset condition, resident safety, and statutory compliance obligations. This modification is made in accordance with Regulation 72(1)(c) of the Public Contracts Regulations 2015. The need for the modification has arisen due to circumstances which a diligent contracting authority could not have foreseen. The modification does not alter the overall nature of the Contract, and the increase in value remains within the permissible 50% threshold under the Regulation. In parallel, the Authority is progressing an appropriate route to market to re establish capacity within the programme. The additional £3,000,000 represents a maximum contingency allowance to safeguard continuity of essential works during this interim period. It is not anticipated that the full uplift will necessarily be utilised; however, it provides the flexibility required to respond to further programme pressures while longer term procurement solutions are implemented. There is no change to the Contract duration, which will continue to end on 22 October 2026, and all other contractual provisions remain unchanged.
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
3ce6eae4-bde2-410a-af02-2ddc0363f93d-710798Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
08849b87-bb0d-4d44-a617-136864b30994-889445Awards and suppliers
Buyer: Together Housing Association LimitedSupplier: Lovell Partnerships Limited
ocds-b5fd17-dc7cecaa-fab8-4672-b58c-445510a64375-1Buyer: Together Housing Association LimitedSupplier: Lovell Partnerships Limited
End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.
ocds-b5fd17-dc7cecaa-fab8-4672-b58c-445510a64375-2