Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
Record references
- Release reference
84de9a84-1b0b-4bf0-bab1-e23edbbbc948-866641- Published tags
- award
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Contracts Finder notice for the full record.
ocds-b5fd17-ff8406ee-9951-4b83-b803-19dae6f29da4Published facts
84de9a84-1b0b-4bf0-bab1-e23edbbbc948-866641Cradge bank form part of one of the embankments of the Ouse Washes Flood storage reservoir. It has identified that the wash face of the bank has eroded during winter and rutted the bank crest and tree/bushes on the bank. Also last winter an emergency repairs to a low spot downstream Earith carried out but some material on the repaired section has washed towards the Wash. The project is to repair erosion on the back of the bank, rutting on the crest, reprofile the low spot and tree work.
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Award notice observed
Latest variant observed by Bidwake on .
Open this official Contracts Finder notice
84de9a84-1b0b-4bf0-bab1-e23edbbbc948-866641Awards and suppliers
Buyer: DgCSupplier: Breheny Civil Engineering Limited
ocds-b5fd17-ff8406ee-9951-4b83-b803-19dae6f29da4-1End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.