Award notice observed
Latest variant observed by Bidwake on .
Open this official Find a Tender notice
Record references
- Release reference
016455-2026- Published tags
- award, contract
Public procurement
See the published facts, notice history, awards and supplier links in one place. Open the original Find a Tender notice for the full record.
ocds-h6vhtk-065afaPublished facts
016455-2026Design, Implementation and Support of the Operator Console solution as per the below: • Provision of a detailed solution design including the following components: • Operator Console desktop • 'Single pane of glass' display across monitors plus a touchscreen & stylus-enabled display sitting at the tabletop level • Seamless interaction and interoperability across a wide range of applications and networks within the 'single pane of glass' concept • No physical KVM or manual display-switching; the solution must be compatible with a single keyboard/mouse • Configurable role-based and user-based personalization of display layouts • Retention of existing physical telephony with capability to migrate to soft client, with the necessary headset connection at each console • Network connectivity as required within console, between consoles and from consoles to comms-room sources. • Design patterns to support extensibility of the solution onto additional desks or to additional control rooms at a future date • Implementation of Operator Console solution: • Deployment of desktop infrastructure (e.g. keyboard, mouse, displays, controllers, networking) onto existing ENCC physical desktops. • Deployment of end-user compute and associated hardware. This may be deployed under the control room desks or racked in a comms room environment, and we would like to explore both options as part of this RFP. • Deployment of highly-resilient connectivity between consoles and compute infrastructure (utilising existing networking suppliers). Strictly Confidential 4 • Implementation of the console across 3 sites: Control Room 1, Control Room 2 and the Control Training Unit. Please note that Control Room 1 and the Control Training Unit are at the same physical site, but different building areas, and Control Room 2 is at a separate physical site. • Early Life Support (ELS) period during the first 12 weeks following the project golive OR until agreed exit criteria are satisfied • Support of Operator Console solution • Provision of second-line support, on an 8-year time horizon as per the Agreement stated below. • 24-hour operational support including on-site response where required
Observed notice trail
Events follow the publisher date where one is available. “Seen by Bidwake” is the date this service first found the record.
Award notice observed
Latest variant observed by Bidwake on .
Open this official Find a Tender notice
016455-2026Awards and suppliers
Buyer: NATIONAL ENERGY SYSTEM OPERATOR LIMITEDSupplier: PROAV LIMITED
016455-2026-1End dates, recurrence wording and links are shown as they appear in public notices. They do not create a new opportunity. If no later linked record appears here, that means Bidwake did not find one in the records it has loaded; it does not prove that none exists.